REAL-TIME BUDGET ENGINE

Hospital Turnkey Project Cost Estimator HUD

Configure your operating room wall finish, medical gas pipeline scope, laminar airflow HVAC, and flooring to generate a preliminary budgetary forecast in real time.

CALCULATOR STATUS: CALIBRATED • ISO 9001:2015
IN-HOUSE MIDC DOMBIVLI PRICING
01

Modular Operating Theatre (MOT) Scope

Select wall cladding material, theatre volume, and HEPA laminar air distribution.

2 OTs
1 OT 3 OTs 5 OTs 7 OTs 10 OTs
02

Medical Gas Pipeline System (MGPS) Scope

Central hospital gas manifold, copper reticulation, and specialized add-ons.

50 Beds
0 (OT Only) 50 Beds 100 Beds 175 Beds 250+ Beds
BUDGETARY ESTIMATE
LIVE HUD ENGINE
₹ 48,50,000 * Approx. Total

* Indicative turnkey estimate based on standard hospital OT dimensions (20' × 20' × 10') and in-house MIDC Dombivli manufacturing. Exact BOQ subject to site feasibility audit.

Modular OT Wall & Ceiling Panels: ₹ 29,00,000
Laminar Flow & HEPA Ceilings: ₹ 11,00,000
Medical Gas Piping (MGPS): ₹ 4,25,000
Selected Add-ons (Flooring/Doors/Panels): ₹ 4,25,000
Rishikesh Sawant
Verified by Rishikesh Sawant Director • Direct Technical Desk: +91 93228 65545